Rejected archive context · not a source record
REJECTED / UNACCEPTED — Limen R1 Bench V1 blueprints
CONCEPT STUDY · RESEARCH ONLY · NO HUMAN TESTING · NOT AVAILABLE · NO DEVELOPMENT PROGRAM EXISTS
The current custody status is REJECTED_INELIGIBLE. The PDF linked here is Revision B, a later corrected producer freeze. It never received fresh Independent QA or Integrator acceptance, so no part of it has standing as the R1 architecture or as a build package.
REJECTED / UNACCEPTED · REJECTED_INELIGIBLE · DO NOT USE AS AUTHORITY
- Current decision
- REJECTED_INELIGIBLE
- Git state
- UNTRACKED_EXCLUDED
- Revision B acceptance
- Absent
- Release
- Unauthorized
What this artifact was for
The producer explored a conservative, non-biological laboratory bench for synthetic voltages and a passive resistance load. It attempted to document a complete module chain, observation points, inhibit handling, failure states, wiring, physical layout, and an unexecuted verification sequence.
That was the producer’s intent, not an accepted design decision. No component was purchased, assembled, powered, calibrated, or tested.
What the ten sheets contain
- Bench chain and signal domains — RB-01 to RB-03
- A proposed complete bench system and wiring chain, a power/reference-domain view, and an input-conditioning and acquisition view.
- Control, inhibit, and interconnect — RB-04 to RB-06
- Local compute/data/control interfaces, output-inhibit and passive-load observation, and proposed connector, terminal, and harness assignments.
- Physical and verification views — RB-07 to RB-10
- A bench layout with assumed physical envelopes, a test-point and bring-up map, failure and disabled-state logic, and an assembly/service decomposition.
This page deliberately does not reproduce the drawings. Their presence and apparent detail do not convert them into accepted engineering instructions.
Why it is not current authority
Independent QA rejected the earlier exact snapshot with FAIL — CORRECTION AND FRESH QA REQUIRED. Findings covered byte determinism and a source-topology contradiction at P1, plus drawing collisions, stale Science status, incomplete USB/BOM closure, and ambiguous first-load measurement order at P2.
Revision B claims corrections and is labeled CORRECTED PRODUCER FROZEN — PENDING FRESH INDEPENDENT QA AND INTEGRATOR ACCEPTANCE. The disposition record found neither a fresh Independent QA PASS nor Integrator acceptance. Current governance therefore preserves the package as REJECTED_INELIGIBLE, excludes it from landing, and keeps new R1 work deferred.
The accepted Engineering R3 record remains controlling. Components, topology, numerical values, native drawings, purchase, assembly, energization, and physical verification remain blocked.
What it cannot establish or authorize
- No accepted part, topology, value, calculation, drawing, wiring assignment, assembly step, verification step, or “selected” label.
- No build-ready bench, validated hardware behavior, measurement independence, standards compliance, safety, effectiveness, feasibility, biological validity, novelty, freedom-to-operate, availability, or readiness conclusion.
- No component purchase, dependency installation, Backend implementation, assembly, energization, calibration, bring-up, fault injection, or test.
- No biological connection, implant work, animal or human work, deployment, publication, or release.
Permitted archive use
Use this page to identify the artifact and understand why it is preserved. The underlying material may be consulted only as a rejected or provisional question source. It must not be reused, restyled, cited as accepted R1 authority, or represented as instructions for purchasing, wiring, assembly, or testing.
Source identity and controlling records
Current Revision B PDF: docs/design-comps/limen/R1_BENCH_V1/LIMEN_R1_BENCH_BLUEPRINTS.pdfPrivate repository source
SHA-256: 8a316c8e2f560efb1f572c424991b885076f8b8a91bdba5778ee9b39080bacd4
Revision B package controls: manifest a4f1501f7d5defdd8d32d632674ec89a9c995425091c84b78bce789ca66e5969; checksum registry 81e716660241f3e784ab2d4afc22cd794cb3b68f99aa14755d256400f2235d24; ordered 41-path digest 2a2dcbf10070ae04540dbee26c080a9bb517b528f3d1c1ccdbf086e584238668.
Earlier QA-rejected PDF: ca1884377f9607cebda918e689cb1dbd8bb7bd70fe3fcd4b7c96597146673f5b. QA findings record: c3afe5cfe1a10d774c8d693035b11b4d11c540ffab801093747fe5ab4ceb90cf.
- R1_BENCH_DISPOSITION.md
- Controlling rejection/unacceptance record: exact rejected snapshot, later corrected Revision B identity, absence of fresh acceptance, and lack of standing.
- QA_FINDINGS.md
- Exact QA disposition
FAIL — CORRECTION AND FRESH QA REQUIRED, stable findings, acceptance conditions, and explicit current non-authorizations. - orchestration/LIMEN_SPLIT_MANIFEST.tsv and project_state.json
- Current custody decision
REJECTED_INELIGIBLE, exclusion from landing, and deferred R1 state. - STEP4_INPUT_CLOSURE/README.md
- Source-status register: QA-failed producer exploration; later corrected Revision B remains unaccepted; no proposed detail has standing.
- R1_BENCH_V1/README.md and ARTIFACT_MANIFEST.md
- Frozen producer intent, Revision B status, non-goals, inventory, and current PDF identity. These records do not grant acceptance.